Exactly 2 weeks to go before the moving starts and there is still much to be done. And as always, January has been a busy period at office. Need to delegate more work and concentrate on this more important stuff. No, not blogging, commenting, chatting or emailing. Moving house is definitely no fun.
The wet and dry kitches are partially completed. They have had to re-do the table top and re-position it as a result of a wider hob being utilized. The backyard is completed, except for painting. The latter should begin in the next day or two and hopefully completed within the week. The grilles will only be done early next week thus delaying the installation of lightings and alarm system. By then, the entire kitchen cabinet should be installed. Now the question remains. Should we go and get a proper oven.
The extended terrace should be completed by this evening. Need to flood the upper floor baths overnight and check out for leaks tomorrow. Hopefully there are none. Thats a big hope.
Perhaps we should have just engaged an ID company to do everything.
Subscribe to:
Post Comments (Atom)
1 comment:
Oooohh yippee! I love decorating!! Have a good weekend Vic :)
Post a Comment